Due to the wartime material and labour shortages I noted yesterday, construction in 1945 was, to say the least, pokey. Where there were 55 “important” building permits listed in the 1946 Annual Report, the number was only 24 in 1945.
Due to the wartime material and labour shortages I noted yesterday, construction in 1945 was, to say the least, pokey. Where there were 55 “important” building permits listed in the 1946 Annual Report, the number was only 24 in 1945.